top of page

Sod Installation

Installing new sod starts with removing the old lawn using a sod cutter, followed by proper disposal. A layer of nutrient-rich triple mix soil is added to support root growth and graded for optimal drainage. Finally, sod is laid in a staggered pattern to prevent shifting and ensure a smooth, finished look. After the job is complete, we send you the information on the watering schedule, which is a 4-week program.

Capture.JPG

Lawn in poor health

This lawn is clearly struggling and will need a lot to bring it back with just seeding and fertilizing

Capture.JPG

Sod cutting

Using the sod cutter we can cut all the old layer of sod off and dispose of it. Leaving a clean yard for the next step.

Capture.JPG

Triple mix soil

Adding fresh nutrient rich soil for the new sod to pull from, while also grading to appropriate slope.

sodonclay3.JPG

Sod

Lastly is laying the sod in a staggered pattern over the new soil and giving it the first watering!

519-400-0237

bottom of page